When a production line stops because a bronze self-lubricating bushing seized at 200 °C, the buyer remembers the things they skipped on the last PO: material grade, running clearance, and whether the part was actually inspected before it left the shop floor.

What Tolerance Fits Bronze Bushings

Most buyers specify a bushing bore to ±0.01 mm and call it done. That misses the real risk. Bronze bushings run against a shaft with a very small radial gap — 0.02 to 0.05 mm for a 10 mm bore, say. If the turning tolerance drifts across a 500-piece run, some pieces bind and others rattle. Ask the machine shop for the actual running-fit calculation, not just a generic tolerance stack-up printed on the drawing.

Material choice changes everything downstream. SAE 660 bronze self-lubricates well up to roughly 200 °C with no external oil or grease. For hotter or greased service, a PTFE-filled bronze grade lasts significantly longer. Write the specific alloy grade on the drawing. "Bronze" alone is not a specification — it leaves the supplier free to substitute a cheaper copper alloy that will not hold its running clearance.

How to Spec Bronze Bushings in RFQs

A workable RFQ for precision turned parts should list: drawing revision number, material grade, bore and OD tolerances, thread type (tapped or machined), surface finish Ra value, burr control requirement, and sample quantity before batch release. Weeda Precision supports CNC turning, prototypes, and batch production on this part family and will flag a missing running-clearance callout before machining starts.

For the first lot, request five sample bushings with a thread-gauge check and a CMM or bore-gauge report attached to the shipment. Once annual volume passes 5,000 pieces, the conversation shifts to packaging — bulk bag, individual poly bags, or indexed trays — and to locking a shorter lead time through a dedicated fixture setup on the lathe.

Before releasing the next PO, pull the last incoming inspection report and confirm the actual bore distribution matched your drawing. If the gap exceeded 0.03 mm on a 10 mm bore, tighten the turning program or move to a multi-axis setup for better concentricity. That fix is ​​far cheaper now than a field recall six months from now.