When you send a drawing for small stainless steel bushings or brass threaded inserts, the quote you receive often hides the real cost drivers. Tolerance callouts, surface finish specs, and material traceability are where buyers lose control of both price and delivery.
What tolerance specs prevent OEM part rejections
A ±0.01 mm tolerance on a 6 mm OD bushing means your turning setup, material batch, and coolant all matter. For copper insert nuts used in plastic molding hardware, thread class 6H on the internal thread is the minimum that keeps assembly lines running without jamming. If your drawing only says "standard," the shop picks the cheapest grade and you discover the gap at final inspection.
Weeda Precision works from your drawing revision and applies thread gauge checks plus surface finish verification on every lot. For batch runs above 500 pieces, they attach a dimensional report with actual readings per critical feature rather than a simple pass/fail stamp.
How to structure your RFQ for precision turned parts
List the material grade (C36000 brass, 303 stainless, or C11000 copper), annual volume in three tiers, and packaging spec—bubble wrap in cartons for electronic sensors, desiccant bags for medical device components. State the sample quantity you need before committing to the batch; 10 to 20 pieces for a first-article check is typical.
Specify lead time expectations and whether drawing revisions are expected mid-project. A buyer who assumes no changes after PO will hit a wall when the customer shifts the threaded insert depth by 0.5 mm. Build revision tolerance into your schedule.
Send your next RFQ with a 2D profile drawing, a 3D CAD file, and the three material, quantity, and lead-time data points above. The quote you get back will be itemized, comparable, and ready for your supplier evaluation.


