Procurement teams often get stuck when a drawing calls for brass insert nuts but the thread fit, insertion depth, or material grade is left vague. A 0.1 mm thread tolerance gap can shift a part from usable to rework. Here is what to lock down before the RFQ goes out.
what tolerance does brass insert nuts need
The thread class on a brass insert nut is the most requested spec on any small-parts drawing. For plastic molding applications, Class 2B internal threads are the baseline. If your bushing presses into an aluminum housing, ask for a thread gauge report with every batch so first-article sign-off does not stall. Weeda Precision includes thread gauge inspection on brass insert nuts and copper insert nuts in the standard QC package, which keeps the approval cycle short.
Tolerance on the outside diameter matters just as much. A 0.05 mm oversize on the body can make the part press-fit too tight in a molded cavity, causing sink marks on the parting line. Specify the OD tolerance as ±0.02 mm and call out burr control at the entrance face. A sharp burr will tear the polymer during insertion and create a visible flash.
how to spec brass insert nuts for RFQ
Attach the current drawing revision number to the RFQ so the miller does not machine against an old print. State the material clearly: C360 brass, C377 copper, or bronze, depending on whether conductivity, corrosion resistance, or stiffness drives the design. List the annual volume, the sample quantity for validation (10 to 20 pieces is typical), and the packaging method. Loosely nested in anti-static bags with a desiccant packet works well for electronics and automation equipment assemblies.
Include the surface finish callout if the insert nut is visible in the final product. For sensor housings and medical device casings, a matte nickel or passivated stainless steel finish changes both the look and the corrosion window. Weeda Precision supports drawing-based CNC turning and multi-axis machining for brass insert nuts, stainless steel bushings, and custom threaded inserts in both prototype and batch production.
Before the next RFQ cycle, pull your last three production reports and cross-check the thread gauge results against the drawing callout. If the data matches, lock the spec in the PO. If a deviation shows up, flag it in writing so the supplier corrects it on the next lot rather than discovering it at the assembly line.


